The on-site construction period for a mass timber building structure is typically 25-40% less than that of a concrete frame structure. This reduction in programme and the ability to undertake subsequent trades concurrently will typically result in a 25% reduction in overall construction programme. Delivering buildings quickly is beneficial on many levels as it reduces cost, risk and disruption and is particularly advantageous on time-critical projects within the education and funded projects within the public sector.