![Eurban Eurban](https://www.eurban.co.uk/wp-content/themes/eurban/assets/img/eurban-logo-large.png)
Mass timber construction is one of the most effective ways to combat climate change.
The on-site construction period for a mass timber building structure is typically 25-40% less than that of a concrete frame structure.
Mass timber building structures are typically 75% lighter than traditional reinforced concrete structures due to the high strength-to-weight ratio of timber.